TM 9-2350-287-20-1
7-67. FRONT NATO INTERVEHICULAR SLAVE CONNECTOR REPLACEMENT.
This Task Covers
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
Equipment Conditions:
l General mechanics tool kit (Item 24,
l Vehicle parked on level ground (refer to
Appendix I)
TM 9-2350-287-10).
l MASTER switch set to OFF (refer to
Materials/Parts:
TM 9-2350-287-10).
l Insulation sleeving (Item 114, Appendix H)
Battery ground cables disconnected (para 7-41).
l Lockwasher (4) (Item 161, Appendix H)
l Lockwasher (2) (Item 164, Appendix H)
a.
REMOVAL
1.
Cut off insulation sleeving (3) from connector (13) to expose two electrical leads 49A and 50A (14 and 8).
Discard insulation sleeving.
2.
Remove screw (10), Iockwasher (9), and positive electrical lead 49A (14) from connector (13). Discard
Iockwasher.
7-203