TM 9-2350-287-10Table 2-1. Preventive Maintenance Checks and Services for Model M992A1LocationItemIntervalItem toCrewmemberNot Fully MissionNo.Check/ProcedureCapable If:ServiceCOMMANDER60WeeklyFatigue (Floor)Inspect fatigue (floor) mats in crewMatscompartment for tears.COMMANDER/CRFWMEMBERS61MonthlyStowageInspect all internal and externalAreasstowage boxes, stops, brackets,decals, shelves, nets, and restraintsfor damage. This is the duty of everycrewmember. Notify Unit mainten-ance if any damage exists.COMMANDER/CREWMEMBERS62MonthlyProjectileRemove projectile rack sections fromRack section miss-Rack Sectionsagainst front wall of crew/cargoing. Safety wirecompartment (p. 2-182). Inspect rackbroken, loose, orandrestraints for broken safety wiresmissing bolts. Rackloose or missing bolts. Check thatinterlocking rodsrack-interlocking rods are not bentbent, cracked, orand are securely installed. Checkmissing. Setscrewthat setscrew at each locking handlefor locking handlepivot is present and secure. Inspect missing. Lockinglocking bars for security.bar will not lock.2-77
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business