Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
removal - TM-9-2350-277-34_726
INSTALLATION - TM-9-2350-277-34_728
TM-9-2350-277-34 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
618
619
620
621
622
623
624
625
626
627
628
TM 9-2350-277-34
REPAIR STE/ICE DISTRIBUTION BOX — Continued
0109 00
8.
Remove screw (1), washer (2), lockwasher (3), and lead (4). Discard lockwasher.
9.
Remove two screws (5), unplug connector (6), and remove wiring harness (7) from
junction box
(8).
10. Remove three remaining screws (1), washers (2), and
lockwashers
(3). Discard lockwashers.
11. Remove circuit card assembly (9) from
junction box
(8).
0109 00-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business