TM 9-2350-277-34
INSTALL PERSONNEL HEATER KIT (M1064A3 ONLY)
0073 00
THIS WORK PACKAGE COVERS:
Installation (page 0073 00-1).
INITIAL SETUP:
Maintenance Level
Direct Support
Tools and Special Tools
General Mechanics Tool Kit (WP 0120 00, Item 62)
Materials/Parts
Sealing compound (WP 0122 00, Item 27)
Adhesive primer (WP 0122 00, Item 23)
Personnel Heater Kit P/N S7K1421
Personnel Required
Track Vehicle Repairer 63H10
References
See your -10
See your -20
Equipment Condition
Ramp lowered (see your -10)
Engine stopped (see your -10)
Carrier blocked (see your -10)
Fire extinguisher removed (see your -20)
Battery ground strap disconnected (see your -20)
Power plant rear access panel removed (see your -20)
Floor plates removed (see your -20)
INSTALLATION
1.
Remove six screws (1), two plates (2), and gaskets (3) from top of carrier. Discard screws, plates, and gaskets.
2.
Remove locknut (4) and screw (5) from transverse beam. Discard locknut and screw.
3.
Remove locknut (6) and screw (7) from power plant compartment bulkhead. Discard locknut and screw.
0073 00-1