TM 9-2350-277-34INSTALL PERSONNEL HEATER KIT (M113A3, M1059A3, AND M58 ONLY) — Continued 0072 00NOTEDisassemble elbow assembly before installing through bulkhead.44. Apply a thin coat of adhesive to clean external tapered threads of fittings.45. Secure elbow (11) to power plant bulkhead with locknut (12).46. Install nut (13) and sleeve (14) onto tube (15).47. Secure tube (15) to nipple body (3).48. Secure tube (15) to elbow (11).49. Secure tube (15) to weldnut (16) with clamp (17), washer (18), and screw (19).0072 00-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business