TM 9-2350-277-34
REPLACE CHASSIS TURRET WIRING HARNESS W8 (M901A3 ONLY) Continued
0032 00
25. Install connector (1) on plate (4) with jamnut (3).
26. Connect right smoke grenade wiring harness connector (2) to connector (1).
FOLLOW-THROUGH STEPS
1.
Install drivers level indicator (see your -20).
2.
Install master switch panel (see your -20).
3.
Install turret (see TM 9-2350-259-34).
4.
Close power plant access door (see your -10).
END OF TASK
0032 00-13/14 blank