Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REPLACE FLUORESCENT LIGHT ASSEMBLIES (M1068A3 ONLY)
REPLACE POWER CONTROL ENCLOSURE ASSEMBLY A1 (M1068A3 ONLY)
TM-9-2350-277-20-6 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
34
35
36
37
38
39
40
41
42
43
44
TM 9-2350-277-20-6
REPLACE FLUORESCENT
LIGHT ASSEMBLIES
(M1068A3 ONLY) — Continued
0825 00
INSTALLATION
1.
Install two fluorescent
light assemblies
(6), light holders (5), washers (4), and thumbscrews (3) on light holder mounts
welded to overhead plate.
2.
Connect fluorescent light assembly electrical connector P1 (1) to cable W11P2 (2).
FOLLOW-THROUGH STEPS
1.
Connect battery ground lead (WP 0338 00).
END OF TASK
0825 00-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business