TM 9-2350-277-20-6REPLACE CYLINDER DISCHARGE TUBES 0899 00THIS WORK PACKAGE COVERS:Removal (page 0899 00-1).Installation (page 0899 00-3).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Materials/PartsLockwasher (6)Personnel RequiredUnit MechanicReferencesSee your -10Equipment ConditionEngine stopped (see your -10)Carrier blocked (see your -10)Trim vane lowered (see your -10)Power plant access door open (see your -10)Power plant removed (WP 0156 00),if bottom discharge tube is to be removedLeft front spall liner opened (M113A3) (see your -10)REMOVAL1. Remove six screws (1), lockwashers (2), and clamps (3)(4)(5)(6) from six hull weldnuts. Discard lockwashers.0899 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business