TM 9-2350-277-20-6REPLACE STE/ICE CREW WIRING HARNESS (M981A3 ONLY) — Continued 0880 005. Install leads (11)(12)(13) and grommets (14) in battery box (15).6. Install lead 779 (11) and battery ground lead (12) on battery terminal adapter (16). Secure with screw (17) and nut (18).7. Install two leads 772/778 (13) on battery terminal adapter (19). Secure with screw (20) and nut (21).FOLLOW-THROUGH STEPS1. Install shunt leads (WP 0872 00).2. Install shunt guard (WP 0869 00).3. Install battery box covers (see your -10).4. Close power plant front access door (see your -10).END OF TASK0880 00-7/8 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business