TM 9-2350-277-20-6REPLACE STE/ICE CREW WIRING HARNESS (M577A3 AND M1068A3 ONLY) —Continued0879 00INSTALLATION1. Plug wiring harness (1) into STE/ICE distribution box (2). Position harness on hull.2. Install connector (3) on bulkhead in power plant compartment. Secure with four screws (4), washers (5), and newlocknuts (6). Have helper assist.3. Connect plug (7) to connector (3).0879 00-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business