TM 9-2350-277-20-6
REPLACE STE/ICE CREW WIRING HARNESS (M113A3, M901A3, AND M1059A3 ONLY)
Continued
0878 00
INSPECTION-ACCEPTANCE AND REJECTION CRITERIA
1.
Check leads for continuity. Use multimeter.
2.
Check connectors.
REPAIR OR REPLACEMENT
1.
Replace bad leads.
2.
Replace cracked or broken connectors (WP 0382 00).
INSTALLATION
1.
Plug wiring harness (5) into STE/ICE distribution box (12), then route harness into position.
2.
Install connector (1) on bulkhead (2) in power plant compartment. Secure with four screws (3), washers (4), and new
locknuts (5).
0878 00-4