TM 9-2350-277-20-6REPLACE STE/ICE CREW WIRING HARNESS (M113A3, M901A3, AND M1059A3 ONLY)— Continued0878 00INSPECTION-ACCEPTANCE AND REJECTION CRITERIA1. Check leads for continuity. Use multimeter.2. Check connectors.REPAIR OR REPLACEMENT1. Replace bad leads.2. Replace cracked or broken connectors (WP 0382 00).INSTALLATION1. Plug wiring harness (5) into STE/ICE distribution box (12), then route harness into position.2. Install connector (1) on bulkhead (2) in power plant compartment. Secure with four screws (3), washers (4), and newlocknuts (5).0878 00-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business