TM 9-2350-277-20-5
REPLACE M14 AIR PURIFIER AND FRAME (M113A3 ONLY)
0774 00
THIS WORK PACKAGE COVERS:
Removal (page 0774 00-1).
Installation (page 0774 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Locknuts (24)
Locknuts (5)
Personnel Required
Unit Mechanic
References
See your -10
See FM 21-40
TM 3-6680-316-10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground strap disconnected (WP 0337 00)
REMOVAL
WARNING
Contaminated filters are hazardous to personnel. Use precautions when handling filters (see
FM 21-40). Dispose of filters using trained chemical environment personnel.
1.
Disconnect power cable (1) from air purifier (2).
2.
Remove three hoses (4) from air purifier (2).
3.
Unfasten latch (5) and lift air purifier (2) from frame assembly (6).
4.
Remove five screws (7), 10 washers (8), five locknuts (9), and frame assembly (6) from five mounts (10) and (11).
Discard locknuts.
5.
Remove 16 screws (12), 32 washers (13), 16 locknuts (14), and four mounts (10) from welded frame (15). Discard
locknuts.
6.
Remove ground wire lead (16).
7.
Remove four screws (17), eight washers (18), four locknuts (19), and mount (11) from bracket (20). Discard locknuts.
0774 00-1