TM 9-2350-277-20-5REPLACE FRONT BILGE PUMP PIPES 0631 00THIS WORK PACKAGE COVERS:Removal (page 0631 00-1).Installation (page 0631 00-3).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Materials/PartsGasketGrommetLocknut (4)Lockwasher (2)Personnel RequiredUnit MechanicReferencesSee your -10Equipment ConditionEngine stopped (see your -10)Carrier blocked (see your -10)Trim vane lowered (see your -10)Power plant access door open (see your -10)Hull front access cover removed (WP 0449 00)Front bilge pump strainer removed (WP 0632 00)REMOVAL1. Remove two screws (1), lockwashers (2), and clamps (3) from two bulkhead weldnuts. Discard lockwashers.0631 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business