TM 9-2350-277-20-5INSPECT POWER PLANT SLING — Continued 0673 007. Inspect structural members for following:a. If welded joints are cracked in excess of 1/2 inch (13 mm) or 25% of length of weld in gusset (1) to cross beam (2)area, remove sling from service.NOTEUse straight edge to measure cross beam bend.b. If cross beam is bent or twisted in excess of 1/4 inch (6 mm) at ends of cross beam, remove sling from service. Donot attempt to straighten a bent cross beam.c. If lifting hole (3) is elongated in excess of 1/8 inch (3 mm), remove sling from service.8. Complete required forms.PREOPERATIVE CHECKWARNINGDamaged lifting slings can fall with load. Personnel can be injured or killed. Inspect all slings.Do not use damaged slings.NOTEChains are inspected on a link by link basis with the chain slack.1. Do Step 2a and Steps 3 - 8 of Periodic Check.END OF TASK0673 00-8