TM 9-2350-277-20-4
ADJUST STEERING WHEEL LINKAGE Continued
0427 00
7.
Secure link (3) on arm (4) with screw (5), washer (6), and new locknut (7).
8.
Secure link (8) on arm (9) with screw (10), washer (11), and new locknut (12).
9.
Tighten jamnut (13) on link (3) and jamnut (14) on link (8).
FOLLOW-THROUGH STEPS
1.
Install drivers power plant access panel (see your -10).
2.
Close power plant access door (see your -10).
3.
Raise trim vane (see your -10).
END OF TASK
0427 00-3/4 blank