Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REPLACE LIFTING EYE
INSTALLATION - TM-9-2350-277-20-4_190
TM-9-2350-277-20-4 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
134
135
136
137
138
139
140
141
142
143
144
TM 9-2350-277-20-4
REPLACE REAR TIEDOWN PLATES
0445 00
THIS WORK PACKAGE COVERS:
Removal (page 0445 00-1).
Installation (page 0445 00-2).
INITIAL SETUP:
Maintenance Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Socket Wrench Set (WP 0926 00, Item 73)
Torque
Wrench (WP 0926 00, Item 86)
Materials/Parts
Sealing compound primer (WP 0928 00, Item 57)
Sealing compound (WP 0928 00, Item 48)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
REMOVAL
1.
Remove 12 screws (1) and two plates (2) from bottom of carrier.
0445 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business