TM 9-2350-277-20-3REPLACE RIGHT HEADLIGHT WIRING HARNESS — Continued 0373 008. Connect leads 514 (10) and 515 (11) to infrared headlamps (12).9. Connect lead 25 (13) to horn (14).10. Connect lead 20 (15) to marker lamp (16).11. Bend and tape leads 17 and 18 (17) and (18) as shown. Connect leads to service headlamps (19).FOLLOW-THROUGH STEPS1. Lower power plant grill (WP 0464 00).2. Connect battery ground strap (WP 0337 00), (WP 0338 00), or (WP 0339 00).3. Close power plant access door (see your -10).4. Raise trim vane (see your -10).END OF TASK0373 00-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business