Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION CONNECT - TM-9-2350-277-20-3_377
REMOVAL - TM-9-2350-277-20-3_380
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
299
300
301
302
303
304
305
306
307
308
309
TM 9-2350-277-20-3
REPLACE BATTERY LEADS AND TERMINALS (M113A3, M901A3, AND
M1059A3 ONLY)
0340 00
THIS WORK PACKAGE COVERS:
Removal (page 0340 00-1).
Cleaning and Inspection (page 0340 00-3).
Installation (page 0340 00-4).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Battery Wire Brush (WP 0926 00, Item 10)
Battery Terminal Puller (WP 0926 00, Item 37)
Materials/Parts
Grease (WP 0928 00, Item 12)
Sodium bicarbonate (WP 0928 00, Item 60)
Grommet (3)
P
ersonnel
Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Battery ground strap disconnected (WP 0337 00)
Spall liners opened (M113A3) (see your -10)
Battery access covers removed (see your -10)
REMOVAL
1.
Remove screw (1), washer (2), and lead (3) from shunt (4).
0340 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business