Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-3_320
INSTALLATION - TM-9-2350-277-20-3_322
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
247
248
249
250
251
252
253
254
255
256
257
TM 9-2350-277-20-3
REPLACE TRANSMISSION OIL HIGH TEMPERATURE SWITCH
0322 00
THIS WORK PACKAGE COVERS:
Removal (page 0322 00-1).
Installation (page 0322 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Sealing compound (WP 0928 00, Item 56)
Thermostatic switch
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Power plant removed (WP 0156 00)
REMOVAL
1.
Disconnect circuit 327 lead (1) from switch (2).
2.
Remove switch (2) from tee (3).
0322 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business