TM 9-2350-277-20-3
REPLACE DISTRIBUTION BOX ASSEMBLY (M901A3 ONLY) Continued
0272 00
2.
Install grommet (5) and circuit 400 lead (6) in distribution box (3).
3.
Install grommet (7) and circuit 450B lead (8) in distribution box (3). Connect circuit 450B lead to circuit breaker (9).
NOTE
If bilge pump circuit breakers were removed, see (WP 0270 00) for installation. If the bilge
pump circuit breakers were not removed, go to Step 7.
4.
Connect circuit 450C lead (10) to circuit breaker (11).
5.
Connect circuit 450A lead (12) to circuit breaker (13).
6.
Install 450C lead (10) on bus bar (14). Secure with new lockwasher (15) and screw (16).
7.
Install grommet (17) and circuit 450 lead (18) in distribution box (3). Connect circuit 450 lead to circuit breaker (19).
8.
Install grommet (20) and circuit 2 lead (21) in distribution box (3).
9.
Install grommet (22) and circuit 2A lead (23) in distribution box (3).
0272 00-4