TM 9-2350-277-20-3REPLACE MASTER SWITCH TO DISTRIBUTION BOX LEAD (CIRCUIT 49) (M577A3 ANDM1068A3 ONLY) — Continued0267 00INSTALLATION1. Install two new grommets (1) on circuit 49 lead (2).2. Route circuit 49 lead (2) through distribution box (3) and master switch panel (4). Install new grommets (1) in boxand panel.3. Install circuit 49 lead (2) on bus bar (5) of distribution box (3). Secure with new lockwasher (6) and screw (7).4. Install circuit 49 lead (2) on master switch terminal (8). Secure with washer (9), and new locknut (10).5. Install master switch panel (4) on distribution box (3). Secure with eight screws (11), washers (12), and newlocknuts (13).FOLLOW-THROUGH STEPS1. Connect battery ground lead (WP 0338 00).2. Turn MASTER SWITCH ON (see your -10).3. Check that MASTER SWITCH light comes on (see your -10).4. Turn MASTER SWITCH OFF (see your -10).END OF TASK0267 00-3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business