Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-2_459
REMOVAL-cont. - TM-9-2350-277-20-2_462
TM-9-2350-277-20-2 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 Carrier Command Post Light Tracked M577A3 2350-01-369-6085 Manual
Page Navigation
394
395
396
397
398
399
400
401
402
403
404
TM 9-2350-277-20-2
REPLACE PRIMARY AND SECONDARY FUEL
FILTER ELEMENTS
0202 00
THIS WORK PACKAGE COVERS:
Removal (page 0202 00-2).
Installation (page 0202 00-5).
INITIAL SETUP:
Maintenance Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Crowfoot attachment, socket wrench, 3/4 inch
(WP 0926 00, Item 16)
Materials/Parts
Gasket (2)
Container (quart)
Primary filter kit
Secondary filter kit
Wiping rag (WP 0928 00, Item 65)
Personnel Required
Unit Mechanic
References
See your -10
E
quipment
Condition
Engine stopped (see your -10).
Carrier blocked (see your -10).
Driver’s power plant access panel
removed (see your -10).
Fuel supply
and return valves turned off (see your -10).
0202 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business