Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-2_439
REMOVAL-cont. - TM-9-2350-277-20-2_442
TM-9-2350-277-20-2 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 Carrier Command Post Light Tracked M577A3 2350-01-369-6085 Manual
Page Navigation
378
379
380
381
382
383
384
385
386
387
388
TM 9-2350-277-20-2
REPLACE FUEL VENT HOSES, TUBES, AND FITTINGS (M577A3 AND
M1068A3 ONLY)
0198 00
THIS WORK PACKAGE COVERS:
Removal (page 0198 00-1).
Installation (page 0198 00-4).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Sealing compound (WP 0928 00, Item 56)
Lockwasher (17)
Suitable container
Personnel Required
Unit Mechanic
References
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Battery ground lead disconnected (WP 0338 00)
Map board removed (see your -10)
Work tables removed (WP 0578 00)
or (WP 0581 00 and WP 0582 00)
REMOVAL
1.
Drain fuel tanks below level of vent hoses (WP 0178 00).
2.
Disconnect vent hose (1) from elbow (2).
3.
Disconnect vent hose (3) from elbow (4).
0198 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business