Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-2_423
REMOVAL-cont. - TM-9-2350-277-20-2_426
TM-9-2350-277-20-2 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 Carrier Command Post Light Tracked M577A3 2350-01-369-6085 Manual
Page Navigation
363
364
365
366
367
368
369
370
371
372
373
TM 9-2350-277-20-2
REPLACE FUEL RETURN HOSES, TUBES, AND FITTINGS (M1064A3
ONLY)
0197 00
THIS WORK PACKAGE COVERS:
Removal (page 0197 00-1).
Installation (page 0197 00-8).
INITIAL SETUP:
Maintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Caulking compound (WP 0928 00, Item 14)
Sealing compound (WP 0928 00, Item 56)
Grommet
Lockwasher (5)
Personnel Required
Unit Mechanic
R
eferences
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Power plant lower rear access panel
removed (see your -10)
Battery ground strap disconnected (WP 0337 00)
Fuel tanks drained (see your -10)
Heater duct removed (WP 0706 00)
Rear floor plates removed (WP 0543 00)
REMOVAL
1.
Separate quick-disconnect coupler (1) from coupler nose (2) inside power plant rear bulkhead.
2.
Remove fuel return hose (3) from elbow (4).
3.
Remove fuel return hose (3) and grommet (5) from bulkhead. Discard grommet.
0197 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business