TM 9-2350-277-20-2
REMOVE/INSTALL POWER PLANT ASSEMBLY
0156 00
THIS WORK PACKAGE COVERS:
Removal (page 0156 00-1).
Installation (page 0156 00-13).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0926 00, Item 65)
Power Plant Sling (WP 0926 00, Item 48)
Torque Wrench (WP 0926 00, Item 85)
Materials/Parts
Cotter pin (5)
Locknut (8)
Lockwasher (2)
Propeller shaft screw (4)
Spring tension washer
Strap
Personnel Required
Unit Mechanic
Helper (H)
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Drivers power plant access panel removed
(see your -10)
Power plant rear access panel removed (see your -10)
Propeller shafts and U-joints removed (WP 0405 00)
Cooling system drained (WP 0227 00)
Battery ground strap disconnected (WP 0337 00),
(WP 0338 00), or (WP 0339 00)
Power plant grill raised (WP 0464 00)
Power plant sling preoperative check performed
(WP 0673 00)
REMOVAL
NOTE
Install covers on disconnected air cleaner lines and components during maintenance. Use tape,
cloth, cardboard, or any appropriate material to prevent damage to components.
1.
Disconnect air supply hose (1) from elbow (2) on air cleaner (3).
2.
Disconnect air restriction indicator hose (4) from bulkhead adapter (5) and reducer (6).
3.
Remove strap (7) from hose (4) and air intake elbow (8). Discard strap.
0156 00-1