AIR CLEANER: REMOVAL, DISASSEMBLY, ASSEMBLY AND INSTALLATION (CONTINUED)
NOTE
Larger bracket (23) is installed on left air cleaner
box (35).
Install two brackets (23) with four screws (20), four new
lockwashers (21) and four flat washers (22).
Remove 2 x 4 supports.
Install three air inlet ducts and hoses (19) (p 4-29).
Install strap (18), flat washer (17) and nut (16).
TA57137
4-26.5
Change 2
TM 9-2350-267-20