TM 9-2350-261-20-243.44.45.If personnel heater is installed, disconnect46.circuit 400 lead (1) from heater control boxlead.If engine coolant heater is installed,disconnect circuit 400A lead (2) from engine 47.coolant heater control box lead.Remove clip (3) and harness (4) fromRemove two locknuts (6), mounts (7 and 8),washers (9), and screws (10) that secureinstrument panel (11) to two struts (12).Discard locknuts.Support panel (11). Remove two screws (13),internal tooth lockwashers (14), and groundlead (15) from two panel mounts (16) andbracket (17). Discard lockwashers.cradle (5).48. Lower panel (11) and support on twostruts (12) to gain access to rear ofinstrument panel.12-118.8Change 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business