7.
8.
9.
10,
Apply a thin, even
to cleaned external
fittings.
Install elbow (1) in
coat of sealing compound
threads of hose ends and
engine left cylinder head.
Install nipple (2) in elbow (1).
Install tee (3) in nipple (2).
11.
12.
13.
TM 9-2350-261-20-1
Connect fuel supply hoses (4 and 5) to
tee (3).
Connect fuel supply hose (5) to secondary
fuel filter (6).
Connect quick-disconnect coupling (7).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
4. Stop/shutdown engine (see your 10).
2. Start engine (see your -10). Check for leaks.
5. Install power plant rear access panel
(page 24-27 or 24-29).
3. Raise and lock ramp (see your -10).
END OF TASK
6-109
INSTALL