TM 9-2350-261-20-1
64.
65.
66.
67.
68.
69.
Install nipple (1) with nut (2) on traverse
beam inside power plant rear bulkhead.
Connect tube assembly (3) to nipple (1).
Install elbow (4) on tube assembly (3).
Install quick disconnect half(5) on
elbow (4).
Connect fuel return hose (6) to nipple (1).
Connect quick disconnect half(7) to quick
disconnect half (5) at power plant rear
bulkhead.
FOLLOW-THROUGH STEPS
1.
2.
3.
4.
Fill fuel tanks (see your-10).
5. Install heater duct (page 29-47).
Connect battery ground leads (page 13-2).
6. Install floor plates (page 24-38).
Start engine (see your10). Check for leaks.
7. Raise and lock ramp (see your 10).
Install power plant rear access panel
8. Stop/shutdown engine (see your 10).
(page 24-27).
9. Unblock earner (see your 10).
6-48.14
Change 2
END OF TASK