TM9-2350-261-20-11. Measure voltage between coolant pump to heaterharness terminal circuit 402B (1) on coolant pumpand ground with switch in start position.2. Does multimeter read less than 17 volts?YES1. Measure voltage between coolant pump to heaterharness circuit 402B (1) on terminal strip (2) andground with switch in start position.2. Does multimeter read less than 17 volts?1I1. Replace coolant heater (page 32-49).2. Verify no faults found.I1. Replace coolant pump toheater harness(page 32-44).2. Verify no faults found.3-224
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business