TM 9-2350-261-20-1
Table 2-1. Unit Level Preventive Maintenance Checks and Services for M113A2 FOV
tern
Interval
Item To
Procedure
Not Mission
No.
Be
Capable If:
Inspected
39
Semi-
Tent and
Replace tent that has tears, breaks,
Annua1
Stowage
fraying or other damage (page 24-183).
Brackets
(M577A2
Tighten screws on mounting clamps
only)
and strip.
40
Semi-
Dome
Check that dome lights and blackout
Annual
Lights
lights work right (see your -10).
and
Troubleshoot faulty lights (page
Switches
3-117).
(M577A2
only)
Change 3 2-65