TM 9-2350-261-10 NOTETwo men are required on eachside of frame to lift it into posi-tion on carrier.7. Attach frame to carrier at twof i t t i n g s.NOTEIf you need protection againstextreme cold weather, installtent liner.See task: INSTALL/REMOVETENT LINER FOR EXTREMECOLD WEATHER, (page 4-31).8. Unroll tent cover alongframework, and unfold sides and9.10.11.12.13.14.Lift rear of frame assembly andinsert both rear legs at thesame time.Install two center legs in frameassembly.Adjust all four legs to contourof ground.Loosen the three wingnutssecuring clamping strips to hullat each side of ramp.Insert beaded edge of coverunder clamping strip. Tightenwingnuts. Two soldiers arerequired (one on top of carrierand one on ground).Raise and lock ramp(page 2-153).4-28end.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business