7.
8.
Start engine (page 2-161).
Release steering levers. Pull back
on both levers so lock buttons
pop up, then ease the levers all
9. Shift range selector to 1 range
(page 2-8).
the way forward.
10.
11.
12.
13.
Apply power slowly until ground
anchors are embedded and
carrier starts forward motion.
Continue forward motion until
carrier is clear and mobile.
After carrier is clear and mobile,
steer to the right or left to
create slack in the opposite rope
to be removed.
Stop carrier (page 2-184).
GO TO NEXT PAGE
TM9-2350-261-10
2-225