TM 9-2350-261-10
C A P S T A N A N D A N C H O R K I T S ( M 1 1 3 A 2 O N L Y )
D E S C R I P T I O N
This task covers:
Prepare Carrier Before Water Operation (page 2-222).
Recover Immobile Carrier (page 2-223).
Recover Anchors (page 2-227).
Stow Kit (page 2-228).
INITIAL SETUP
Personnel Required:
Equipment Condition:
Driver
Engine stopped (Page 2-184)
Crew
PREPARE CARRIER
3.
BEFORE WATER
O P E R A T I O N
1.
2.
Remove two capstan drums
4.
stowed on top deck of carrier.
Loosen four straps securing
5.
anchor kit and stowage tarpaulin
to top deck of earner.
Loosen three stowage straps and
remove nylon ropes and two
shackles.
Fasten three stowage straps and
close tarpaulin.
Secure tarpaulin to carrier top
deck with four straps.
2 - 2 22