Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REPLACE NOZZLES, TUBES, AND FITTINGS (NEW CONFIGURATION) Continued - TM-9-2350-247-20-3_644
REPLACE NOZZLES, TUBES, AND FITTINGS (OLD CONFIGURATION) Continued
TM-9-2350-247-20-3 Carrier Cargo Tracked 6 Ton M548A12350010969356 (EIC: AEU) M548A3 2350013696081 (EIC: AE9) Manual
Page Navigation
543
544
545
546
547
548
549
550
551
552
553
TM 9-2350-247-20-3
REPLACE NOZZLES, TUBES, AND FITTINGS (OLD CONFIGURATION)
0525 00
THIS WORK PACKAGE COVERS:
Removal (page 0525 00-1).
Installation (page 0525 00-2).
INITIAL SETUP:
M
aintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0541 00, Item 57)
M
aterials/Parts
Lock nut (2)
Personnel Required
Unit Mechanic
R
eferences
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Driver’s seat raised (see your -10)
Both battery negative leads disconnected (WP 0292 00)
Center seat raised (see your -10)
REMOVAL
1.
Remove nozzle (1) from tube (2).
2.
Remove lock nut (3), washer (4), screw (5), and clamp (6) from carrier bulkhead. Discard lock nut.
3.
Loosen nut (7) that secures tube (2) to cylinder (8).
4.
Remove lock nut (9), washer (10), screw (11), and clamp (12) from carrier bulkhead. Discard lock nut. Remove tube (2).
5.
Remove boot (13) from carrier bulkhead.
0525 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business