TM 9-2350-247-20-3REPLACE NOZZLES, TUBES, AND FITTINGS (NEW CONFIGURATION) — Continued 0524 00INSTALLATIONNOTEInspect lines, tubes, nozzles, and clamps for damage. Replace as needed.1. Install boot (1) on carrier bulkhead.2. Install screw (2), washer (3), and new lock nut (4) securing clamp (5) to carrier bulkhead. Install tube (6).3. Tighten nut (7) that secures tube (6) to cylinder (8).4. Install tee (9) on tube (6).5. Install tube (10) on tee (9).0524 00-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business