TM 9-2350-247-20-3
REPLACE CARGO DOOR INSULATION
0469 00
THIS WORK PACKAGE COVERS:
Removal (page 0469 00-1).
Installation (page 0469 00-1).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0541 00, Item 57)
Materials/Parts
Cleaning compound (WP 0542 00, Item 9)
Insulation tape WP 0542 00, Item 25
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
REMOVAL
1.
Scrape insulation (1) from cargo door (2).
2.
Remove remaining insulation and adhesive with cleaning compound.
INSTALLATION
1.
Trim new insulation to fit. Cut panels into sections about 3 feet square (1 m) in size.
2.
Make sure surface to be covered is clean and dry. Spray or swab cleaning compound on back of insulation to activate
adhesive.
3.
Allow 10 to 15 seconds for adhesive to become tacky. Butt sections together and press them firmly into place at once.
END OF TASK
0469 00-1/2 blank