TM 9-2350-247-20-3
INSPECT POWER PLANT SLING
0443 00
THIS WORK PACKAGE COVERS:
Periodic Check (page 0443 00-1).
Preoperative Check (page 0443 00-7).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanics Tool Kit (WP 0541 00, Item 57)
Drill set (WP 0541 00, Item 14)
Straight edge (WP 0541 00, Item 50)
Measuring tape (WP 0541 00, Item 52)
Suitable Lifting Device
Personnel Required
Unit Mechanic
Equipment Condition
Sling suspended from suitable lifting device
PERIODIC CHECK
WARNING
Damaged lifting slings can fall with load. Personnel can be injured or killed. Inspect all slings.
Do not use damaged slings.
NOTE
Chains are inspected on a link by link basis with the chain slack.
1.
Check chains (1) for excessive wear.
a.
For 9/32 inch (7 mm) chain, if any link (2) is worn at any point in excess of 3/64 inch (1 mm) or chain size is less
than 15/64 inch (6 mm) in diameter, remove sling from service. Use drill set as No-Go gauge and/or caliper.
b.
For 3/8 inch (10 mm) chain, if any link (2) is worn at any point in excess of 5/64 inch (2 mm) or chain size is less
than 19/64 inch (8 mm) in diameter, remove sling from service. Use drill set as No-Go gauge and/or caliper.
2.
Check chains (1) for excessive stretch.
a.
If any link (2) does not hinge freely with adjoining link, remove sling from service.
0443 00-1