TM 9-2350-247-20-1
REMOVE/INSTALL POWER PLANT (M548A3) Continued
0131 00
INSTALLATION
WARNING
Damaged lifting slings can fall with load. Personnel can be injured or killed. Inspect all slings.
Do not use damaged slings.
1.
Inspect sling for damage (WP 0443 00).
CAUTION
Trunnion cap and spacer can get damaged. Make sure trunnion and spacer are positioned and
installed correctly before you install mounting bolts.
NOTE
Make certain transmission aligning ring is installed in groove in lower half of right transmission
mount or transmission trunnion.
2.
Attach sling to power plant lifting points, making sure shackle is in hole stamped B.
WARNING
Lifting sling may slip and allow power plant to drop. Personnel may be injured. Be sure sling is
firmly attached and maintains engine support.
3.
Slowly lift and position power plant on its mounts inside carrier.
0131 00-9