Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Table 16. Semi-Annual Unit Level Preventive Maintenance Checks and Services for M548A1 and M548A3 CONT. - TM-9-2350-247-20-1_665
Table 16. Semi-Annual Unit Level Preventive Maintenance Checks and Services for M548A1 and M548A3 CONT. - TM-9-2350-247-20-1_667
TM-9-2350-247-20-1 Crane (CAB) Components Recovery Vehicle Full Tracked: light Armored M578 (2360-00-439-6242) (EIC:3LA) Manual
Page Navigation
556
557
558
559
560
561
562
563
564
565
566
TM 9-2350-247-20-1
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS — Continued
0128 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
C
REWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
j. Check battery box
heat exchangers
and hose
connections for leaks. Tighten connections that
leak. Replace connections that continue to leak
(WP 0476 00).
k. Check hose. Replace damaged hoses
(WP 0476 00).
Any Class III
coolant or fuel
leaks.
0128 00-76
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business