Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Table 16. Semi-Annual Unit Level Preventive Maintenance Checks and Services for M548A1 and M548A3 CONT. - TM-9-2350-247-20-1_662
Table 16. Semi-Annual Unit Level Preventive Maintenance Checks and Services for M548A1 and M548A3 CONT. - TM-9-2350-247-20-1_664
TM-9-2350-247-20-1 Crane (CAB) Components Recovery Vehicle Full Tracked: light Armored M578 (2360-00-439-6242) (EIC:3LA) Manual
Page Navigation
553
554
555
556
557
558
559
560
561
562
563
TM 9-2350-247-20-1
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS — Continued
0128 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
C
REWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
58
Semi-
Annual
Engine Coolant
Heater Kit
NOTE
Coolant lines on right side of battery are
for M548A3 engine coolant heater.
a. Check engine coolant heater clamps and
exhaust
pipes for
exhaust
leaks. Tighten clamps.
Replace cracked or damaged pipe (WP 0480 00
or WP 0481 00).
Any exhaust
leaks.
0128 00-73
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business