TM 9-2350-247-10OPERATE MATERIAL HANDLING KIT — Continued 0029 00USE HOIST1. Remove stowage strap and unstow chains.2. Release trolley lock and position hoist over load.3. Wrap two web slings around load for secure hoisting.4. Use hand chain to lower load chains to connect load chain hook to slings.5. Use hand chain to raise load clear of loading surfaces. Then move the hoist with the load to where you want it.6. Use hand chain to lower load. Disconnect hook on load chain from slings. Remove slings from load.0029 00-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business