TM 9-2350-247-10OPERATE MATERIAL HANDLING KIT 0029 00THIS WORK PACKAGE COVERS:Adjust Hoist (page 0029 00-1).Use Hoist (page 0029 00-3).Prepare Hoist for Travel (page 0029 00-4).INITIAL SETUP:Maintenance LevelOperatorPersonnel RequiredDriver (2)Equipment ConditionEngine stopped (WP 0023 00), (WP 0024 00)Carrier blocked (WP 0038 00)ADJUST HOIST1. Loosen two hoist beam locks and slide beam to a full-forward position for travel or full-rear position for loading.2. Tighten two hoist beam locks to hold beam in place.3. Move beam to side position you choose.a. Beam supports may be positioned in any of three holes in each support bow.b. Each beam may be set up in one of seven positions shown.0029 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business