TM 9-2350-261-34
ASSEMBLE
17.
18.
19.
20.
21.
22.
Install connector J7 (21), gasket (22), four
screws (15), and locknuts (16) on box (6).
Install two catch assemblies (1), pads (2),
six screws (3), washers (4), and nuts (5) on
box (6).
24.
Install two caps (7), screws (8), and new
locknuts (9) on faceplate (10).
Install three connectors (23, 24, and 25),
gaskets (26), dust caps (27), 12 screws (15),
and new locknuts (16) on faceplate (10).
NOTE
Install four binding posts (11) on
faceplate (10).
Use wiring diagram (page 21.1-49).
25. Connect three lead terminals (28) on
connector J13 (23).
Install connector J22 (12), gasket (13), dust
cap (14), four screws (15), and new
locknuts (16) on faceplate (10).
26. Connect three lead terminals (28) on
connector J12 (24).
Install two connectors J113 and J114 (17)
27. Connect three lead terminals (28) on
and jamnuts (18) on faceplate (10).
connector J11 (25).
Install two connectors J9 and J10 (19) and
jamnuts (20) on box (6).
23.
21.1-50
Change 4