TM 9-2350-261-34
ASSEMBLE
8. If removed, install new gaskets (1) by
applying a thin coat of adhesive to phone
extension box surface and to gasket surface.
Allow 10 to 20 minutes to dry (tacky to the
touch). Position gasket on phone extension
box and press firmly into place.
NOTE
Use wiring diagram to identify location of
post by color and for rewiring connector
J1 and binding posts.
10. Install connector J1 (3) on phone extension
box (4). Secure with four screws (5) and
new locknuts (6).
11. Install 24 binding posts (7) on faceplate (8).
12. Connect all leads (9) to 24 binding posts (7).
13. Install new straps (10), as required.
14. Install faceplate (8) on phone extension
box (4). Secure with 12 new
lockwashers (11) and screws (12).
9. Install leads (2) in connector J1 (3).
FOLLOW-THROUGH STEPS
1. Stow phone extension box in stowage box
(see your -20).
END OF TASK
21.1-46
Change 4