TM 9-2350-261-20-4
REPLACE POWER ENTRY BOX ASSEMBLY A4 (M1068 ONLY)
THIS WORK PACKAGE COVERS:
INITIAL SETUP:
Personnel Required
Maintenance Level
Power-Generation Equipment Repairer 52D10
Unit
Helper (H)
Tools and Special Tools
Equipment Condition
Engine stopped (see your -10)
Materials/Parts
Carrier blocked (see your -10)
All external power disconnected (TM 11-7010-256-
Lockwasher (12)
12&P)
Battery ground lead disconnected (WP 0294 00)
REMOVAL
NOTE
Tag all leads during removal for proper installation later.
1.
Remove 12 screws (1), lockwashers (2), and lid (3) from power distribution box (4). Discard lockwashers.
2.
Remove three screws (5) and lockwashers (6) from terminal block (7).
3.
Remove two cable W13 leads (8), two cable W14 leads (9), and one ground lead (10) from terminal block (7).
4.
Remove three screws (11), washers (12), and power entry box (13) from external rear bulkhead. Feed leads through rear
of bulkhead. Have helper assist.
5.
Do not remove gasket (14) unless damaged.