FOLLOW-THROUGH STEPS
1. Close power plant front access door and raise
4. Raise and lock ramp (see your -10).
trim vane (see your -10).
5. Unblock carrier and operate earner
2. Install hull front access cover (page 24-24).
(see your -10). Check that pivot steer system
operates properly.
3. Start engine (see your -10). Check for
hydraulic leaks.
6. Stop/shutdown engine (see your -10).
END OF TASK
23-70
TM 9-2350-261-20-2