Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 10-4. PERSONNEL HEATER SUPPORT ASSEMBLIES AND RESILIENT MOUNTS REPLACEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  9-2350-287-34 10-4. PERSONNEL   HEATER   SUPPORT   ASSEMBLIES   AND   RESILIENT   MOUNTS REPLACEMENT. This Task Covers: a.   Removal b.   Installation Initial Setup: Tools/Test Equipment: General mechanic's tool kit (Item 19, Appendix D) Materials/Parts: Self-locking nut (4) (Item 119, Appendix H) Personnel  Required:  Two Equipment Conditions: Left and right projectile rack assemblies moved to rear of vehicle (refer to TM 9-2350-287-10). Numbers 1 and 2 engine AFES cylinder bottles removed (refer to TM 9-2350-287-20-2). Numbers 1 and 2 engine AFES cylinder bottle bracket straps, brackets, and mounts removed (refer to TM 9-2350-287-20-2). Personnel heater removed (refer to TM 9-2350-287-20-2). Personnel heater mounting clamps and brackets removed (refer to TM 9-2350-287-20-2). PowerPack removed (refer to TM 9-2350-287-20-1). Engine compartment bulkhead insulation and shields removed (para 9-3). a. 1. 2. 3. 4. b. 1. 2. 3. 4. REMOVAL Remove two screws (2) and washers (3) and upper supporl assembly (12) from forward bulkhead (6). Remove two screws (4) and washers (5) and lower support assembly (7) from forward bulkhead (6). Remove four screws (1), washers (11), and self-locking nuts (10), two angles (13), and two angles (9) from upper and lower support assemblies (12 and 7). Remove four resilient mounts (8) from upper and lower support assemblies (12 and 7). INSTALLATION Insert four resilient mounts (8) in upper and lower support assemblies (12 and 7). Install two angles (9) and two angles (13) on upper and lower support assemblies (12 and 7) with four screws (1), washers (11), and self-locking nuts (10). Install lower support assembly (7) on forward bulkhead (6) with two screws (4) and washers (5), finger-tight. Install upper support assembly (12) on forward bulkhead (6) with two screws (2) and washers (3), finger-tight. 10-16

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business