| |
TM 9-2350-287-34
9-3. ENGINE COMPARTMENT BULKHEAD INSULATION AND SHIELDS REPLACEMENT
(continued).
7.
Install two screws (24) and new Iockwashers (25) in personnel heater exhaust duct (26).
8.
9.
10.
Position shield (19) in place on bulkhead (4) and connect fuel lines (16 and 18) to fittings (15 and 17).
Position shield (20) in place on bulkhead (4) and secure with three screws (21) and washers (22).
Position shield (23) in place on bulkhead (4) and secure with four screws (14) and washers (13). Install
screws (12) and washers (11 ) in shield (23) and bulkhead (4).
11.
Position shield (10) in place on bulkhead (4) and secure with two screws (8) and washers (9).
12.
Position shield (3) in place on bulkhead (4) and secure with 13 screws (1), eight washers (7), and five washers
(2).
13.
Install tube (6) in place and tighten tube nuts (5).
FOLLOW-ON MAINTENANCE:
Install engine air cleaner ducts and hoses (refer to TM 9-2350-287-20-1).
Install engine mount release bar (para 3-5).
Install lower fuel tank (para 4-4).
Install powerpack (refer to TM 9-2350-287-20-1).
.
9-12
|