| |
TM 9-2350-287-20-2
SECTION II MAINTENANCE ALLOCATION CHART
FOR
CARRIER, AMMUNITION, TRACKED,
M992A1
(1)
Group
Number
(2)
Component Assembly
(3)
Maintenance
Function
(4)
Maintenance Level
(5)
Tools and
Equipment
(6)
Remarks
C
O
F
H
D
2901
APU Assembly, APU
Test
0.2
1.5
1, 2, 4, 6,
Support Assembly and
Service
1.5
45
Resilient Mounts
Replace
1.2
Repair
20.0
2916
APU Oil Filler Cap, Filter
Inspect
0.1
1, 2, 6
Element, Gage, Lines
Replace
0.7
and Fittings
Repair
0.4
2919
APU Driving Mechanism
Replace
0.5
4, 6
Assembly
2933
APU Air Cleaner and
Service
0.1
1, 2, 6
Air Intake Ducting
Replace
0.1
Repair
0.1
2937
APU Fuel Filters
Replace
0.5
6
2938
APU Fuel Lines and
Replace
0.5
6
Fittings
2941
APU Exhaust Muffler,
Replace
0.2
6
Pipes and Shield
2952
APU Exhaust Cooling
Replace
0.6
1, 2, 6
Ducts and Engine Shrouds
Repair
1.0
2961
APU Generator and
Replace
0.5
1, 2, 6
Mounting Strap
Repair
1.0
2963
APU Wiring
Replace
1.0
1, 2, 6
Harness (All)
[Text Deleted]
33
SPECIAL PURPOSES
KITS
3307
Ventilation Kit
Replace
1.0
4-6
42
ELECTRICAL EQUIPMENT
4209
STE/ICE Current Shunt
Inspect
0.1
2, 6
Replace
0.1
Repair
0.2
Change 1 B-18
|